• WeChat official account for the department
    WeChat official account for undergraduate students of the department
    WeChat official account for graduate students of the department
    WeChat official account for alumni of the department
    WeChat official account for the Energy Internet Research Institute, Tsinghua University
    WeChat official account for the Sichuan Energy Internet Research Institute, Tsinghua University

清华大学电机系

清华大学电机系本科生

清华大学电机系研究生

清华大学电机系校友会

清华大学能源互联网创新研究院

faculties

Guo Hong ye

Current Location: Home > faculties > Guo Hong ye > Content
职称 Associate Professor 职称2 Associate Professor, Department of Electrical Engineering
电话 010-62795767 地址 RM 3-203, West Main Building, Tsinghua University, Haidian District, Beijing, 100084
邮箱 hyguo@tsinghua.edu.cn 研究方向 Power Market, Demand-Side Flexibility, Artificial Intelligence & Big Data Analytics
职能分工

1. Selected Academic Funds

1. Special Project of National Natural Science Foundation of China (NSFC): New Energy Supporting Market Linkage Characteristics and Its Interaction Mechanism for New Energy System (72342007), Duration: 2024.1-2027.12, Funding: 2,000,000 CNY, Role: Participant

2. Youth Project of National Natural Science Foundation of China (NSFC): Analysis and Modeling Methods of Industrial and Commercial Users' Energy Use Behavior Considering Physical and Social Characteristics (52107102), Duration: 2022.1-2024.12, Funding: 300,000 CNY, Role: P.I.

3. Key Project of National Natural Science Foundation of China (NSFC): Carbon Measurement Technology and Planning, Operation, and Trading Methods of Electric Power System under Carbon Perspective (52130702), Duration: 2022.1-2026.12, Funding: 3,000,000 CNY, Role: Participant

4. Project of Beijing Electrical Engineering Society: Research on Green Power Trading Mechanism and Green Power Consumption Guarantee Market Mechanism (20222001835), Duration: 2022.11-2023.12, Funding: 300,000 CNY, Role: P.I.

5. Joint Fund Project of National Natural Science Foundation of China (NSFC): Multi-type User Behaviour Modeling, Characterization and Interaction Optimization for Electricity Internet of Things (U2066205), Duration: 2021.1-2024.12, Funding: 2,540,000 CNY, Role: Participant

6. General Grant of China Postdoctoral Science Foundation: Analysis and Modelling Theory of Renewable Energy Trading Behavior with Data Mechanism Fusion (2021M691722), Duration: 2021.6-2022.6, Funding: 80,000 CNY, Role: P.I.

7. General Project of National Natural Science Foundation of China (NSFC): Research on Layout Optimization and Incentive Mechanism for Synergistic Development of Wind and Solar Power in China in the Medium and Long Term (71974109), Duration: 2020.1-2023.12, Funding: 495,000 CNY, Role: Participant

8. General Project of National Natural Science Foundation of China (NSFC): Theory and Methods of Energy Internet Operation with Effective Global Information Sharing and Peer-to-Peer Decentralized Decision Making (51777102), Duration: 2018.1-2021.12, Funding: 510,000 CNY, Role: Participant

2. International Collaboration Projects

1. National Natural Science Foundation of China (NSFC)-International (Regional) Cooperation and Exchange Project: Extremely High Percentage of Renewable Power System under Carbon Neutral Target (52381340167), Duration: 2023.7-2023.12, Funding: 148,000 CNY, Role: Participant

3. Government Consulting Projects

1. Research on Key Mechanisms for Deepening the Construction of National Unified Electricity Market—Research on Dispatch and Operation Mechanisms of Power Grids, Duration: 2024.7-2024.12, Role: Participant

2. Research on Power System Reform Mechanisms Adapted to New Power System, Duration: 2024.8-2024.9, Role: Participant

3. Research on Market Mechanisms for the Participation of New Market Entities in the Electricity Market, Duration: 2023.12-2024.7, Role: Participant

4. Research on Distribution Mechanisms Adapted to New Power System, Duration: 2023.12-2024.5, Role: Participant

5. Research on Consumer-Side Electricity Price Reform Adapted to New Power System, Duration: 2023.9-2024.3, Role: Participant

6. Research on the Pathways and Impacts of National Unified Electricity Market Construction, Duration: 2023.7-2023.12, Role: Participant

4. Industrial Projects

1. State Grid Corporation Science and Technology Project: Research on the Generator-Grid-Load Uncertainty Perception and Power Balance Analysis Indicator System, Duration: 2024.8-2026.12, Role: P.I. of Sub-project

2. NDRC Energy Research Institute Consulting Project: Research on High-Proportion Renewable Energy Power Market, Duration: 2024.7-2024.12, Role: P.I.

3. State Grid Corporation Science and Technology Project: Study on the Electricity Market Trading Mechanism and Key Technologies to Promote the Development and Utilization of Large Energy Bases under the Framework of the National Unified Electricity Market, Duration: 2024.7-2025.12, Role: P.I. of Sub-project

4. State Grid Corporation Science and Technology Project: Study on the market mechanism of wind-and-thermal benefits for the large base in deserts, Duration: 2024.7-2024.12, Role: Participant

5. Science and Technology Project of Three Gorges Corporation: Study on the Development Outlook of New Power System, Duration: 2023.7-2025.7, Role: Participant

6. State Grid Corporation Science and Technology Project: Research on Cost Analysis, Market Bidding Mechanism and Verification of New Power System Transformation, Duration: 2023.5-2025.7, Role: P.I. of Sub-project

7. State Grid Corporation Science and Technology Project: Research and Application of Flexible Demand Response Technology of Air-conditioning Load, Duration: 2023.5-2025.12, Role: Participant

8. Science and Technology Project of Shenzhen Power Supply Bureau Co., Ltd.: Research on the Design of Electricity Market Mechanism and Construction Implementation Plan Supporting Multi-Level Market Cooperation and Carbon Electricity Coupling, Duration: 2023.4-2025.4, Role: P.I.

9. State Grid Corporation Science and Technology Project: Research on Assessment Methods and Market Mechanisms for Flexible Ramping Products in New-Type Power Systems, Duration: 2023.1-2024.12, Role: P.I. of Sub-project

10. State Grid Corporation Science and Technology Project: Research on Key Technologies and Application of Flexible Ramping Product Market for New-Type Power System, Duration: 2023.1-2024.12, Role: Participant

11. State Grid Corporation Science and Technology Project: Research on Key Technologies for Decision Making and Simulation Evaluation Supporting Precise Load Management of New-Type Power Systems, Duration: 2022.10-2024.12, Role: P.I. of Sub-project

12. State Grid Corporation Science and Technology Project: Research on Cooperation of Large Energy Storage Cluster and Renewable Considering Multi-level Section Coupling Constraints, Duration: 2022.10-2024.12, Role: Participant

13. State Grid Science and Technology Project: Research on Trading Mechanism and Key Technologies of Power Balancing Groups in China, Duration: 2022.10-2024.12, Role: Participant

14. State Grid Science and Technology Project: Power Trading Simulation Model Construction and Demonstration Application for New-Type Power Systems, Duration: 2022.7-2024.7, Role: Participant


—— Share ——

上一页 [1] [2] [3] [4] [5] 下一页

Close